For Dřevozpracující Družstvo Lukavec, we prepared a five-year energy modernisation plan. The study estimates potential energy savings of 15–20%; this is not an achieved result.
Updated:
Collaboration
A five-year energy modernisation plan
MANUFACTURING
For Dřevozpracující Družstvo Lukavec, we prepared an energy study proposing a phased modernisation of the company’s energy systems over five years. The modernisation will not only substantially reduce the energy intensity of production (by an estimated 15–20% at least) but also cut the carbon footprint and, with it, the cost of emission allowances.